Skip to main content
Sample Scope of WorkPlumbing / Tile

Bathroom Remodel

Example project description

“Full bathroom remodel. We want to replace the vanity, toilet, floor tile, and shower tile. The bathroom is about 55 square feet. Currently has a tub/shower combo that we want to convert to a walk-in shower.”

Generated Scope of WorkSample Only
Scope of Work
📅 Example Only
📋

Project Overview

Full bathroom remodel in an approximately 55 SF space. Scope includes removal of existing tub/shower combo and conversion to walk-in shower, new floor tile, vanity replacement, and toilet replacement. Work requires licensed plumber and tile setter coordination.

🔨

Scope of Work

  1. 1Protect adjacent areas; shut off water supply to bathroom
  2. 2Demolish existing tub/shower combo — remove tub, surround, and backer board
  3. 3Remove existing floor tile and prep subfloor (level and waterproof as needed)
  4. 4Remove and dispose of existing vanity and toilet
  5. 5Frame and waterproof new walk-in shower area — install Schluter or Wedi board system
  6. 6Install new shower floor pan and linear or center drain
  7. 7Install wall tile in shower (floor to ceiling, estimated 65 SF)
  8. 8Install new floor tile throughout bathroom (55 SF)
  9. 9Install new vanity and faucet per owner selection
  10. 10Install new toilet (standard or comfort height per owner)
  11. 11Connect all plumbing — supply lines, drain, shutoff valves
  12. 12Install shower door or frameless glass enclosure
  13. 13Caulk all seams, grout all tile, finish and touch up
📦

Materials Required

  • Cement backer board / waterproofing system — ~$220
  • Shower floor pan + drain — ~$180
  • Wall tile (65 SF + 12% overage) — ~$520
  • Floor tile (55 SF + 12% overage) — ~$385
  • Tile setting materials (thinset, grout, spacers) — ~$140
  • Vanity with sink (allowance) — ~$450
  • Faucet set — ~$95
  • Toilet — ~$220
  • Shower door / enclosure (allowance) — ~$600
  • Plumbing supplies (supply lines, shutoffs, drain) — ~$120
  • **Materials subtotal (with 12% overage): ~$3,290**
👷

Labor Requirements

  • Trades: Licensed plumber + tile setter + general labor
  • Crew: 2–3 workers
  • Estimated hours: 40–50 hours over 5–7 days
  • **Labor subtotal (with 25% overhead): ~$3,500**
  • --
💰

Estimated Project Cost

Ballpark Estimate
Materials$3,290
Labor$3,500
TOTAL$6,790

⚠️ Ballpark estimate. Final cost depends on tile selections, fixture allowances, extent of subfloor repair, and regional labor rates.

⚠️

Site Safety Requirements

  • Shut off water and verify no active flow before demolition
  • GFCI outlets required near all wet areas per code
  • Proper ventilation during adhesive and waterproofing application
  • Confirm permit requirements with local building department
🧹

Cleanup & Disposal

  • Demo debris removed and hauled off daily
  • All packaging disposed of properly
  • Final clean of all tile and fixtures before handoff
🛡️

Warranty Expectations

  • Tile installation: 1 year workmanship
  • Waterproofing: 2 years
  • Plumbing connections: 1 year
  • Manufacturer warranties on all fixtures and hardware

© 2026 TAGS — The Apartment Guys System. All rights reserved.

Generated by TAGS · tagyourproject.com

Get a custom scope for your actual project

Upload photos and describe your repair. TAGS generates a professional SOW tailored to your specific project — in under 60 seconds.

Property managers: 3 free SOWs to start. Homeowners: $20 per scope.

More sample scopes