Concrete Repair & Replacement

Example project description

“I need to replace a section of my driveway near the street entrance. The area is approximately 10 feet wide by 10 feet deep. The concrete is cracked and heaving. I also need the lazy curb along the street edge replaced — it's about 10 feet long and broken in two places.”

Generated Scope of WorkSample Only
Scope of Work
📅 Example Only
📋

Project Overview

Remove and replace one deteriorated driveway section measuring approximately **10 ft × 10 ft (100 SF)** at the street entrance, including replacement of the adjacent **10 LF lazy curb** (rolled mountable curb) along the street edge. Existing concrete shows heaving, transverse cracking, and surface spalling consistent with subgrade settlement and freeze-thaw deterioration. Lazy curb shows two fracture points with displacement. *Note: If subgrade erosion, utility conflicts, or root intrusion are found during excavation, additional remediation will be required before concrete can be poured — see Exclusions.*

🔨

Scope of Work

  1. 1Mark work area boundaries; call 811 utility locate minimum 48 hours before excavation
  2. 2Saw-cut existing driveway section at clean, straight lines to isolate the 10 ft × 10 ft removal area; saw-cut lazy curb at both ends to create clean tie-in joints
  3. 3Demolish and remove approximately 100 SF of driveway slab and 10 LF of lazy curb; haul all concrete debris off-site
  4. 4Excavate subgrade to 4-inch depth across driveway section and 6-inch depth under lazy curb profile; inspect for soft spots, erosion, or root intrusion — document findings before proceeding
  5. 5Compact subgrade; install and compact minimum 4-inch crushed aggregate base (3/4-inch stone) across full driveway area; compact lazy curb subgrade to match existing curb profile
  6. 6Install form boards for driveway section at correct grade and pitch — minimum 1/8-inch per foot slope away from garage for drainage; form lazy curb to match existing street profile and radius
  7. 7Install expansion joint material at tie-in with existing driveway and at garage apron interface
  8. 8Pour 4,000 PSI concrete with synthetic fiber reinforcement across both areas in a single pour where feasible; finish driveway section to broom texture; finish lazy curb to smooth rolled profile matching existing
  9. 9Saw-cut one transverse control joint at the 5-foot mark in the driveway section to manage future cracking
  10. 10Protect fresh concrete: foot traffic — 48 hours minimum; vehicle traffic — 7 days minimum; heavy loads — 28 days
📦

Materials Required

| Item | Quantity | Notes |

|---|---|---|

| Ready-mix concrete, 4,000 PSI + fiber | ~1.75 CY | Covers 100 SF slab @ 4" + 10 LF lazy curb profile |

| Crushed aggregate base, 3/4" | ~1.5 CY | 4" depth under slab, 6" under curb |

| Form boards and stakes | 50 LF est. | Slab perimeter + curb forms |

| Expansion joint material | 20 LF est. | Tie-ins and apron interface |

| Concrete sealer (optional) | 1 gal | Coverage ~200 SF; apply after 28-day cure |

👷

Labor Requirements

  • 2–3 crew members; 1 full day for demo, prep, and pour
  • Ready-mix truck access from street required — confirm clearance before scheduling
  • Saw-cut operator and equipment required for demolition cuts and control joint
⚠️

Site Safety Requirements

  • Concrete PPE required: rubber boots, chemical-resistant gloves, eye protection for all crew
  • Fresh concrete area barricaded with high-visibility tape and signage — pedestrian and vehicle access blocked until cured
  • Saw-cut operations require dust suppression (wet method preferred), eye protection, and respiratory protection
  • Street-side work requires traffic control or cones if curb work affects vehicle approach
🧹

Cleanup & Disposal

  • All demolished concrete (~1.5 CY) removed and disposed of off-site; concrete recycling preferred where available
  • Excess aggregate and form materials removed
  • Driveway approach and street edge broom-clean upon completion
🛡️

Warranty Expectations

  • Workmanship warranty on new concrete flatwork and lazy curb: 1 year
  • Control joints are designed to manage cracking — hairline cracks at joint locations are normal and expected
  • Contractor not responsible for cracking caused by tree root intrusion, freeze-thaw cycles beyond normal, or vehicle loads exceeding residential design specification (typically 4,000 lbs per axle)
  • Sealer reapplication every 3–5 years recommended
📄

Exclusions

Repair to existing driveway sections outside the 10 ft × 10 ft marked area; street curb repair beyond the 10 LF lazy curb; utility relocation; decorative finishing, staining, or stamping unless separately specified; landscaping or sod restoration adjacent to work area. Any concealed subgrade conditions discovered during excavation will be documented and quoted separately before proceeding.

💰

Estimated Project Cost

Materials (concrete, base, forms)$420
Labor (demo, prep, pour, finish)$980
Disposal$120
TOTAL$1,520

© 2026 TAGS — The Apartment Guys System. All rights reserved.

Generated by TAGS · tagyourproject.com

Get a custom scope for your actual project

Upload photos and describe your repair. TAGS generates a professional SOW tailored to your specific project — in under 60 seconds.

Property managers: 3 free SOWs to start. Homeowners: $20 per scope.

More sample scopes