Gutter Repair & Replacement

Example project description

“I need to replace all the gutters on the house. It's about 235 linear feet total. I want 5-inch gutters. The job includes downspouts and there are 4 elbows. The existing gutters are original to the house — over 20 years old — and they're pulling away from the fascia in multiple places.”

Generated Scope of WorkSample Only
Scope of Work
📅 Example Only
📋

Project Overview

Remove and replace full perimeter gutter system — **235 LF of 5-inch K-style seamless aluminum gutter** — including all downspouts, **4 offset elbows**, end caps, miters, hidden hangers, and outlet drops. Existing gutters are original construction (20+ years), showing fascia separation at multiple points, failed sealant at joints and miters, and rust-through at outlet connections. *Note: If fascia board rot or soffit damage is found during removal, additional remediation will be required before new gutters can be installed — see Exclusions.*

🔨

Scope of Work

  1. 1Remove all existing gutters, downspouts, spikes, and ferrules from full perimeter (235 LF); haul all material off-site
  2. 2Inspect all fascia boards for rot, soft spots, or damage at attachment points — document findings before proceeding
  3. 3Fabricate 235 LF of 5-inch K-style seamless aluminum gutter on-site using portable seamless gutter machine; cut to run lengths per elevation
  4. 4Install inside and outside miters at all corners; seal all joints with gutter sealant rated for aluminum
  5. 5Set pitch on all gutter runs — minimum 1/16-inch drop per foot toward outlet drops for positive drainage
  6. 6Secure gutters to fascia with hidden hanger brackets at 24-inch on-center spacing; use gutter screws (no spikes)
  7. 7Install outlet drops at all 6 downspout locations; seal outlet flanges to gutter interior
  8. 8Install 4 offset elbows (A-style + B-style pairs as needed) to bring downspouts flush with wall surface at each transition point
  9. 9Run 3×4-inch rectangular aluminum downspout from each outlet drop to 6 inches above grade; secure to wall with downspout straps at 6-foot intervals
  10. 10Install downspout extensions at each termination point — minimum 4-foot discharge from foundation
  11. 11Final flush test on each gutter run with water; confirm full drainage to downspout outlets with no standing water
📦

Materials Required

| Item | Quantity | Notes |

|---|---|---|

| 5" K-style seamless aluminum gutter | 235 LF | Fabricated on-site; .027 gauge; color TBD |

| 3×4" rectangular aluminum downspout | 60 LF est. | 6 downspouts × 10 LF avg |

| Inside/outside miters | 8–10 ea | Quantity depends on house layout |

| End caps (left + right) | 10 ea | 2 per gutter run end |

| Outlet drops | 6 ea | One per downspout location |

| Offset elbows (A + B style) | 4 sets | Per scope; additional if layout requires |

| Hidden hanger brackets + gutter screws | 120 ea | At 24" OC for 235 LF |

| Downspout straps | 12 ea | 2 per downspout |

| Downspout extensions | 6 ea | 4-foot minimum discharge |

| Gutter sealant, aluminum-compatible | 6 tubes | Miters, end caps, outlets |

👷

Labor Requirements

  • 2–3 technicians; 1 full day (8–10 hours)
  • Seamless gutter machine truck on-site for fabrication
  • Ladder access to full roof perimeter required
  • Scaffolding or ladder jacks may be required for two-story elevations or long uninterrupted runs
⚠️

Site Safety Requirements

  • Ladder stabilizers required on all placements; no lean against existing fascia or gutter
  • Spotter required at base of all ladders on two-story elevations
  • Notify occupants before beginning; vehicles moved from driveway to allow machine truck access
  • Landscaping protected where ladders are placed at ground level
🧹

Cleanup & Disposal

  • All 235 LF of old gutters, downspouts, spikes, and ferrules removed and hauled off-site; aluminum recycling where available
  • All packaging and cutoff material removed
  • Fascia and surrounding surfaces wiped down; landscaping cleared of gutter debris
🛡️

Warranty Expectations

  • Workmanship warranty on installation, sealant joints, and pitch: 2 years (seamless gutter standard)
  • Manufacturer material warranty on aluminum gutter and downspout material: 20 years typical
  • Warranty void if fascia rot is not fully remediated prior to installation
  • Gutters should be cleaned of leaf and debris buildup annually to maintain drainage performance
📄

Exclusions

Fascia board repair or replacement; soffit repair; roof or shingle work; gutter guard or leaf protection unless separately specified; painting or color-matching to trim unless specified; landscaping restoration. Any concealed fascia rot or structural damage found during removal will be documented and quoted separately before proceeding.

💰

Estimated Project Cost

Materials (gutter, downspouts, hardware)$1,220
Labor (removal, fabrication, installation)$1,100
Disposal$80
TOTAL$2,400

© 2026 TAGS — The Apartment Guys System. All rights reserved.

Generated by TAGS · tagyourproject.com

Get a custom scope for your actual project

Upload photos and describe your repair. TAGS generates a professional SOW tailored to your specific project — in under 60 seconds.

Property managers: 3 free SOWs to start. Homeowners: $20 per scope.

More sample scopes